Sign In | Join Free | My xpandrally.com
China TANGSHAN MINE MACHINERY FACTORY logo
TANGSHAN MINE MACHINERY FACTORY
TANGSHAN MINE MACHINERY FACTORY
Active Member

5 Years

Home > Cement Ball Mill >

Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines

TANGSHAN MINE MACHINERY FACTORY
Contact Now

Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines

Brand Name : JINMA

Model Number : cement mill

Certification : ISO9001

Place of Origin : China

MOQ : 1

Price : US$ 2500-40000/piece

Payment Terms : T/T

Delivery Time : one month

Packaging Details : Standard shipping packaging

type : Ball Grinder

name : Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines

specifications : Various specifications

Attributes : Mining Machine

Mine : Gold Ore

Application : Mines

Advantage : Energy saving

Motor Type : AC Motor

Contact Now

Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines

PRINCIPLE
When the tubular body is rotating,the fillings and grinding medium is brought up to a certain height by the tubular body, and then they fall down or roll down freely from the wall of tubular body.The grinding of ores grinding ore to powders by wallop made by falling grinding medium and its grinding and peeling activity.

Cement Ball Mill Features

1) To use the ball mill, the material to be ground is loaded into the neoprene barrel that contains grinding media.

2) As the barrel rotates, the material is crushed between the individual pieces of grinding media that mix and crush the product into fine powder over a period of several hours.

3) The longer the ball mill runs, the finer the powder will be.

Name Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines
Advantage Energy Saving
Capacity 15t/H

PARAMETER
Technical Specifications and Performance

Specification Production Capacityt/h Rotating speed
r/min
Feed particle size Reducer Power
mm Models kw
 
MQ Φ 1.83x6.4 5-6 23.3 ≤ 20 ZD 60 210
MQ Φ 2.2x9.5 11-15 21.4 ≤ 20 ZD 80 475
x12 12-16 21.4 ≤ 20 ZD 80 570
MQ Φ 2.4x8 14-18 20.4 ≤ 20 ZD 110 475
x9 12-16 20.4 ≤ 20 ZD 110 570
x10 16-19 20.4 ≤ 20 ZD 110 630
x11 17-21 20.4 ≤ 20 ZD 110 630
x13 22-25 21.4 ≤ 20 ZD 110 800
MQ Φ 2.6x13 26-30 19.11 ≤ 20 ZD 110 1000
MQ Φ 3x13 33-37 19.36 ≤ 20 MBY 900 1400
MQ Φ 3.2x13 45-50 17.42 ≤ 20 MBY 1000 1600
MQ Φ 3.4x13 50-55 17.2 ≤ 20 JDX110 2000
MQ Φ 3.5x13 20-60 17 ≤ 20 JDX110 2000
MQ Φ 3.6x13 55-60 16.5 ≤ 20 JDX120 2240
MQ Φ 3.8x13 40-65 16 ≤ 20 JDX120 2500
MQ Φ 4.0x13 65-70 15.5 ≤ 20 DBS280 2800
MQ Φ 4.2x13 75-90 15 ≤ 20 MFY320 3150
MQ Φ 4.3x14 80-90 15 ≤ 20 MFYX360 3550

Company introduction

Tangshan Mine Machinery Factory is a specialized manufacturer that produces complete sets of equipment for metallurgy, mining, building materials, environmental protection, as well as the design and manufacture of complete sets of sand and gravel materials, and the design and manufacture of dry tailings discharge. The company was founded in 1971 and turned into a joint-stock enterprise in 1997.

The company occupies more than 50 acres, with total assets of 90 million yuan and more than 200 employees, including 96 engineering and technical personnel.

The main products are: various models and specifications of Jinma brand crushers, ball mills, classifiers, magnetic separators, dewatering screens, linear screens, screening machines, feeders, vertical roller mills, etc.

Among them, 17 products have obtained national patents. Among them, the crusher and ball mill have won many national honors.
Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For MinesEnergy Saving Gold Ore 15t/H Cement Ball Mill Machine For MinesEnergy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines

FAQ to save your precious time!

Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.

Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.

Q3: How long does it take to deliver?

Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.

Q4: Do you provide machine operation guidance?

Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.


Product Tags:

15t/h cement ball mill

      

15t/h dry ball mill

      

iso passed dry cement ball mill

      
Wholesale Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines from china suppliers

Energy Saving Gold Ore 15t/H Cement Ball Mill Machine For Mines Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TANGSHAN MINE MACHINERY FACTORY
*Subject:
*Message:
Characters Remaining: (0/3000)